Improvements in a Sewage Network : Discussion of the Creation of a Water Waste Pumping Station in María Grande
Resumen
Summary: At present, María Grande has two sewage treatment pools which are at surface level. However, a neighborhood called Santa Ana is at a lower level than these pools. For this reason, this neighborhood is not connected to the sewage network. The purpose of the work is to describe the problem that the Santa Ana neighborhood has to connect their sewage pipelines to the sewage network of Maria Grande. This analysis is going to include the identification of the causes and consequences of this problem. As well as this, a feasible solution to the problem of the sewage network is going to be discussed.
Resumen: En la actualidad, María Grande cuenta con dos piscinas de tratamiento de aguas residuales que se encuentran a nivel de superficie. Sin embargo, un barrio llamado Santa Ana se encuentra a un nivel más bajo que estas piscinas. Por esta razón, este barrio no está conectado a la red de alcantarillado. El propósito de este trabajo es describir el problema que enfrenta el barrio de Santa Ana para conectar sus tuberías de alcantarillado a la red de alcantarillado de María Grande. Este análisis incluirá la identificación de las causas y consecuencias de este problema. Además, se discutirá una solución factible para el problema de la red de alcantarillado.
Colecciones
El ítem tiene asociados los siguientes ficheros de licencia: