Buscar
Mostrando ítems 11-12 de 12
Economic implications when considering availability in the optimal design and operation of a NGCC power plant.
(2012-09)
- Traditionally, power plants are designed to fulfll a pre-specified external demand, usually by oversizing the existing equipment, which implies excessive capital costs and might even result in designs that cannot satisfy ...
Optimal management policies for the economic optimal dispatch of a hydrothermal power grid.
(2016-06)
Presentación en diapositivas realizada en : EngOpt 2016, 19 al 23 de Junio de 2016, Foz de
Iguazú, Brasil.