FRP Enseñanza

Permanent URI for this communityhttp://48.217.138.120/handle/20.500.12272/1252

Browse

Search Results

Now showing 1 - 1 of 1
  • Thumbnail Image
    Item
    Water Optimization in Paraná: Implementation of a Wastewater Treatment Plant
    (2023-12) Bogarín, Brenda; Martinez, María de los Milagros
    Summary— The city of Paraná is located to the west of the Entre Ríos province. Being situated alongside the Paraná River, the city confronts a pressing problem. Untreated wastewater is being discharged in the Paraná River daily. The purposes of this work are to give awareness about wastewater, show causes and consequences and analyze a solution to the problem. To achieve these purposes, this paper is divided into three different sections that imply an analysis of the problem in context, its causes and consequences, a description of a solution by means of the installation of a wastewater treatment plant and a conclusion. Resumen— La ciudad de Paraná está ubicada al oeste de la provincia de Entre Ríos. Estando situada junto al río Paraná, la ciudad se enfrenta a un problema urgente. Las aguas residuales están siendo introducidas al río diariamente sin tratamiento previo. Los propósitos de este trabajo son generar conciencia sobre las aguas residuales, mostrar causas y consecuencias y analizar una solución al problema. Para lograr estos propósitos, este trabajo está dividido en tres diferentes secciones que implican un análisis del problema y su contexto, sus causas y consecuencias, una descripción de la solución que requiere la instalación de una planta de tratamiento de aguas residuales y una conclusión.