Simultaneous planning and scheduling of multistage multiproduct batch plants with non-identical parallel units and sequence-dependent changeovers
Date
2014
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
A mixed integer linear programming model for the
simultaneous planning and scheduling of multistage
multiproduct batch plants in a multiperiod context is presented
in this work. The batch plant is composed by a set of stages with
parallel units of different sizes. The scheduling decisions are
modeled considering mixed product campaign-based operation
mode and sequence-dependent changeover times. Thus, for each
time period, the number of batches of each product in the
campaign, the batch assignment to units in each stage and its
sequencing, and the number of repetitions of the campaign are
jointly determined. Also, decisions about production and storage
of different products, and raw material consumption and storage
are taken into account. The approach capabilities are highlighted
through an example.
Description
Keywords
Mixed product campaign, Non-identical parallel units, Changeovers, Multiperiod planning, Mixed integer linear programming
Citation
Endorsement
Review
Supplemented By
Referenced By
Creative Commons license
Except where otherwised noted, this item's license is described as info:eu-repo/semantics/openAccess