Detailed planning and inventory optimization model in the mattress industry
dc.creator | Montagna, Jorge Marcelo | |
dc.creator | Cecchietti, Aldo | |
dc.creator | Rodriguez, María Analía | |
dc.creator | Corsano, Gabriela | |
dc.date.accessioned | 2018-09-10T17:46:10Z | |
dc.date.available | 2018-09-10T17:46:10Z | |
dc.date.issued | 2015 | |
dc.description.abstract | In this work, a mixed integer linear programming (MILP) model for the simultaneous production and inventory planning problems is proposed, which arise in the industrial context of polyurethane foam manufactory. The production process considers the foam blooming stage as well as the curing step where the blocks are dried. Several tradeoffs are involved in the overall model given that detailed inventory management decisions are also taken into account in the formulation. Several study cases provided by a local company are tested to show the model performance. | es_ES |
dc.description.affiliation | Fil: IDTQ-PLAPIQUI (CONICET-UNC), Av. Vélez Sarsfield 1611, Ciudad Universitaria, X5016GCA, Córdoba, Argentina | es_ES |
dc.description.affiliation | Fil: INGAR (CONICET-UTN), Avellaneda 3657, Santa Fe 3000, Argentina | es_ES |
dc.description.peerreviewed | Peer Reviewed | es_ES |
dc.description.sponsorship | VIII CAIQ 2015 AAIQ Buenos Aires y 3 JASP | es_ES |
dc.format | application/pdf | |
dc.identifier.uri | http://hdl.handle.net/20.500.12272/3101 | |
dc.language.iso | eng | es_ES |
dc.relation.projectid | “Integración de sistemas soporte de decisión para la gestión optima de la cadena de suministros utilizando sistemas empresariales” Código:25/0152 | es_ES |
dc.relation.references | Fumero, Y.; Corsano, G.; Montagna, J. M. (2011). Planning and Scheduling of Multistage Multiproduct Batch Plants Operating under Production Campaigns. Ann. Oper. Res., 199, 249–268. | es_ES |
dc.relation.references | Fumero, Y.; Corsano, G.; Montagna, J. M. (2013). Integrated Modeling Framework for Supply Chain Design Considering Multiproduct Production Facilities. Ind. Eng. Chem. Res., 52, 16247–16266. | es_ES |
dc.relation.references | Grossmann, I. E. (2012). Advances in Mathematical Programming Models for Enterprise-Wide Optimization. Comput. Chem. Eng., 47, 2–18. | es_ES |
dc.relation.references | Lin, B. M. T.; Lin, Y.-Y.; Fang, K.-T. (2013). Two-Machine Flow Shop Scheduling of Polyurethane Foam Production. Int. J. Prod. Econ., 141, 286–294. | es_ES |
dc.relation.references | Maravelias, C. T.; Sung, C. (2009). Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities. Comput. Chem. Eng., 33, 1919–1930. | es_ES |
dc.relation.references | Marchetti, P. A.; Gupta, V.; Grossmann, I. E.; Cook, L.; Valton, P.-M.; Singh, T.; Li, T.; André, J. (2014). Simultaneous Production and Distribution of Industrial Gas Supply-Chains. Comput. Chem. Eng., 69, 39–58. | es_ES |
dc.relation.references | Mogaji, P. B. A (2014). Decision Support System for Process Planning and Control of Polyurethane Foam Production http://www.scitechnol.com/a-decision-support-system-for-process-planning-and-control-of-polyurethane-foam-production-fd2A.pdf (accessed Aug 20, 2014). | es_ES |
dc.relation.references | Relvas, S.; Boschetto Magatão, S. N.; Barbosa-Póvoa, A. P. F. D.; Neves, F. (2013). Integrated Scheduling and Inventory Management of an Oil Products Distribution System. Omega, 41, 955–968. | es_ES |
dc.relation.references | Rodriguez, M. A.; Vecchietti, A. (2010). Inventory and Delivery Optimization under Seasonal Demand in the Supply Chain. Comput. Chem. Eng., 34, 1705–1718 | es_ES |
dc.relation.references | Rosenthal, R.E. (2013). GAMS- A User's Guide. GAMS Development Corporation, Washington, DC, USA. | es_ES |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.rights.uri | http://creativecommons.org/publicdomain/zero/1.0/ | * |
dc.rights.use | autorizo la publicación de la obra desde su aprobación/presentación | es_ES |
dc.rights.use | CC0 1.0 Universal | * |
dc.subject | Production planning | es_ES |
dc.subject | Inventory management | es_ES |
dc.subject | Polyurethane foam | es_ES |
dc.subject | MILP | es_ES |
dc.title | Detailed planning and inventory optimization model in the mattress industry | es_ES |
dc.type | info:eu-repo/semantics/conferenceObject | es_ES |
dc.type.snrd | docunento de conferencia | es_ES |
dc.type.version | info:eu-repo/semantics/acceptedVersion | es_ES |
Files
Original bundle
1 - 1 of 1
- Name:
- DETAILED PLANNING AND INVENTORY OPTIMIZATION.pdf
- Size:
- 580.72 KB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 5.73 KB
- Format:
- Item-specific license agreed upon to submission
- Description: